Gounkoto Gold Mine

Extraction of 165 million bcm during 12 years

Mining

Mali, 2011 - 2023

General description

As an exclusive subcontractor of Barrick, DTP Mining has been responsible for mining and extraction work at the Gounkoto goldmine in Mali since 2011. The 12-year contract schedules the extraction of 165 million bcm of materials.

Having operated in Mali since 2000, DTP Mining was previously responsible for:

  • - Operating the Morila goldmine (8 million bcm of materials extracted per year – 80 million bcm in 10 years) on behalf of Barrick between 2000 and 2009.
  • - Then the recovery and treatment at this same site of 18 million bcm of ore stores with a low gold content between 2009 and 2013,
  • - The Morila Push Back project (extension of the mine) over a period of 23 months (2013-2015) concerning the extraction of 10 million bcm
  • - Operating the Loulo goldmine, located not far from the Gounkoto site, from 2009 to 2012.

 

Consortium

DTP MINING

Project owner

BARRICK

165 million

bcm of extraction

24 hours a day

7 day a week

700

people

Locations

Associated Projects

Tongon Gold Mine
Tongon Gold Mine

Extraction of more 110 million bcm during 11 years

More info
Kibali Gold Mine
Kibali Gold Mine

Extraction of 110 million bcm during 12 years

More info