France, 2010 - 2012
General description
Construction of a dual function structure 348m-long crossing the Vienne river, a local road and a railway track.
MAIN CHARACTERISTICS
- Structure 348 m in length.
- Construction of 6 piers using reinforced concrete box girders installed by undercutting
- Construction of 2 bridge decks with 2 x 32 sections using 2 travelling formwork systems