France, 2004 - 2008
General description
metal piles
MAIN CHARACTERISTICS
The 2,700-tonne bases and 3,200-tonne gabions were placed at the bottom of the Seine by jacking down. The 4 reinforced concrete circular gabions and 2 bases were built over the water, suspended by pre-stressing cables on piles. VSL France then lowered the structures 20 m by heavy lifting©.
The 4 reinforced concrete pylon like pillars more than 66 m high were built using climbing formwork.
The 450-tonne structural steelwork that support the pulleys operating the lift bridge were set up at a height of 70 metres on the pylons by a floating crane.