Switzerland, 2012-2015
Upgrading of the Alpine tunnel of the Swiss rail operator, Chemins de Fer Fédéraux (CFF), between Brig (Valais canton) and Iselle (Italy).
Work on the 19.8-km-long twin-tube tunnel on the Lötschberg Tunnel route comprises:
- modification of the 35 cross-passages,
- construction of 4 new cross-passages,
- enlargement of existing niches and refuges,
- construction of 60 km of ductbanks,
- trackbed lowering over 1.6 km,
- construction of 16 km of drains.