A15 motorway / RN 184 highway interchange

Work for grade separation of interchange on the A15 motorway and RN 184 national highway

Bridges

France, 2009-2011

General description

Construction of grade-separation works for the A 15 / RN 184 interchange, including temporary diversions, final slip roads, three bridges, and a noise barrier.

Operation carried out as part of a consortium.

Consortium

BOUYGUES TRAVAUX PUBLICS 40% / SACER 30% / DTP TERRASSEMENT 30 %

Project owner

DIRECTION INTERDEPARTEMENTALE DES ROUTES ILE-DE-FRANCE

Key figures

165,000

vehicles per day

1

Works with live traffic

22 month

work period

Locations

Associated Projects

Porte des Lilas
Porte des Lilas

Paris ring-road cover slab

More info
A14 motorway - Chambourcy interchange
A14 motorway - Chambourcy interchange

Half hour off trip from Poissy to Saint-Germain-en-Laye.

More info
Massy-Palaiseau dedicated-running mass transit
Massy-Palaiseau dedicated-running mass transit

Dedicated-running mass transport system

More info