Decking over tracks at Paris Austerlitz station

Decking slab over part of railway tracks

Bridges

France, 2009-2013

General description

Construction of a decking slab over part of the railway tracks to allow construction of a high-rise building above the tracks.

MAIN CHARACTERISTICS

Works performed:

- Deep foundations, substructure, structure (steel and concrete) of the cover slab and precast shell elements for cladding the soffit,

- Extension of the underground passage and technical duct beneath the tracks.

Consortium

BOUYGUES TRAVAUX PUBLICS

Project owner

SEMAPA RESEAU FERRE DE FRANCE

Key figures

20,255m²

of shuttered surfaces

23,000m³

of concrete

9,790 T

of structural steelwork

Locations

Associated Projects

Porte des Lilas
Porte des Lilas

Paris ring-road cover slab

More info
A14 motorway - Chambourcy interchange
A14 motorway - Chambourcy interchange

Half hour off trip from Poissy to Saint-Germain-en-Laye.

More info
A15 motorway / RN 184 highway interchange
A15 motorway / RN 184 highway interchange

Work for grade separation of interchange on the A15 motorway and RN 184 national highway

More info