Doha Sewer Drainage System Tunnels – MTS01

Design-build of sewer drainage system tunnels

Underground Works

Qatar, 2015-2019

General description

As part of a strategic project to collect, pump and treat wastewater from the southern part of the city of Doha, Bouygues Travaux Publics - working as part of a consortium with Bessac and local company UrbaCon Trading & Contracting - excavated 16.2 kilometres of tunnels for the new sewerage network. The tunnels were dug using two earth pressure tunnel boring machines at an average depth of 28 metres. For the first time at Bouygues Travaux Publics, part of the access shafts were dug using the Vertical Shaft Sinking Machine, a roadheader with a rotary cutter, enabling vertical excavation.

Consortium

BOUYGUES TRAVAUX PUBLICS / URBACON TRADING & CONTRACTING / BESSAC

Project owner

ASHGHAL PUBLIC WORKS AUTHORITY

Locations

Associated Projects

Tuen Mun-Chek Lap Kok Link
Tuen Mun-Chek Lap Kok Link

Design-build of a subsea road tunnel

More info
Liantang road tunnel
Liantang road tunnel

Design-build of two motorway tunnels, a ventilation structure and an administrative building

More info
Eole: RER E extension
Eole: RER E extension

Construction of a rail tunnel (extension of RER E towards the west)

More info