HS2, High-Speed Rail Line

Design-build of section C1 of the HS2 project

Underground Works

United Kingdom, 2020-2026

General description

The ALIGN consortium (Bouygues Travaux Public / Sir Robert McAlpine / VolkerFitzpatrick) is in charge of the design and construction of section C1 of HS2, a high-speed rail line that will provide a non-stop link between London and Birmingham. This 21.6-kilometre section north-west of London includes a 3.4 kilometre-long viaduct (Colne Valley Viaduct) and two 16.04 kilometre-long tunnels (Chilterns Tunnels). Variable-density TBMs, a technology already used by Bouygues Travaux Public in Hong Kong and on the Grand Paris Express project, will be used to adapt excavations to the specific geological conditions of the terrain. The work also includes the construction of cross passages between the two tunnels, as well as five ventilation shafts.

Consortium

ALIGN (BOUYGUES TRAVAUX PUBLICS - SIR ROBERT MCALPINE-VOLKERFITZPATRICK)

Project owner

DEPARTMENT FOR TRANSPORT / VILLE DE LONDRES

Locations

Associated Projects

Tuen Mun-Chek Lap Kok Link
Tuen Mun-Chek Lap Kok Link

Design-build of a subsea road tunnel

More info
Eole: RER E extension
Eole: RER E extension

Construction of a rail tunnel (extension of RER E towards the west)

More info
NorthConnex motorway link
NorthConnex motorway link

Design-build of a twin-tube motorway toll tunnel

More info