Jamaica, 2007-2010
General description
Design and construction of a 20-km stretch of dual two-lane motorway in hilly terrain between Linstead and Moneague.
MAIN CHARACTERISTICS
It is one of five sections in the North–South link between Spanish Town and Ocho Rios.