Tanger Med II port

Extension of Tangier container port

River and Maritime works

Morocco, 2010-2014

General description

Build-and-design contract for extension of the Port of Tangier. Two new container terminals provide capacity for an extra 5.2 million containers per year.

MAIN CHARACTERISTICS

The works consist of:

- a main breakwater consisting of a 955-m-long rubble-mound structure (including 5,760 Accropodes™) and a 2710-m-long caisson structure (96 four-cell caissons),

- a secondary breakwater consisting of a 377-m-long rubble-mound structure (including 3,581 Accropodes™) and a 341-m-long caisson structure (10 four-cell caissons),

- 1200 m of quays made with unreinforced mass-concrete blocks,

- 760,000 m² of cargo-handling area. The seafloor is dredged less than 16 m from the quay walls.


Project carried out as part of a consortium.

Consortium

BOUYGUES TRAVAUX PUBLICS 24,12%; BYMARO 24,12%; SAIPEM 24,12%; BESIX 13,82%; SOMAGEC 13,82%

Project owner

TM2SA

Key figures

106

caissons

4,400 m

of breakwaters

5,2

million annual container capacity

Locations

Associated Projects

Caucedo container terminal
Caucedo container terminal

First cargo port on the island River and Maritime Works

More info
Tanger Med I Port
Tanger Med I Port

New Tangier container port

More info