HKW-DSD TUNNEL

Stormwater drainage tunnel

Underground Works

Hong-Kong, 2007-2011

General description

Design-and-build project for a 10,5-km-long drainage tunnel to overcome flooding problems in Hong Kong.

MAIN CHARACTERISTICS

- Two tunnels driven by hard-rock TBM: one 6.5 km long with internal diameter of 7.25 m (8.24 m external diameter); one 4 km long with internal diameter of 6.25 m (7.14 m external diameter).

- 32 cross-passages excavated by drill-and-blast, varying from 20 to 800 m in length and totalling 8.6 km.

- 32 vertical shafts sunk by raise boring, between 16 and 175 m deep, for a total excavation depth of 3.4 km.

- 2 tunnel portals.

Consortium

DRAGAGES HONG-KONG 50%; NISHIMATSU 50%

Project owner

DRAINAGE SERVICE DEPARTMENT OF HONG-KONG

Key figures

10,5 Km

of tunnel

32

shafts (raise bored)

2

TBMs

Locations

Associated Projects

Ivry–Masséna storage tunnel
Ivry–Masséna storage tunnel

Stormwater storage tunnel

More info
Bezons detention basin
Bezons detention basin

Stormwater overflow basin

More info