ePrivacy and GPDR Cookie Consent management by TermsFeed Privacy Policy and Consent Generator

Express Rail Link contract 821

Construction of a rail tunnel (Hong Kong-Guangzhou express rail line)

Underground Works

Hong-Kong, 2010-2015

General description

The Guangzhou-Shenzhen-Hong Kong express rail line links these three large Chinese cities with trains travelling at up to 300 kilometres/hour. For this project, the Dragages Hong Kong and Bouygues Travaux Publics joint venture blast-excavated an approximately 3-kilometre-long single tube tunnel (contract 821). A 3.5-kilometre twin-tube tunnel was also built using two tunnel boring machines for the section between Mei Lai Road and Hoi Ting Road (contract 820). A special feature of contract 821: a largesized cavern where the junction tunnel meets the main tunnel.

Consortium

DRAGAGES HONG-KONG / BOUYGUES TRAVAUX PUBLICS

Project owner

MASS TRANSIT RAILWAY CORPORATION

Locations

Associated Projects

Groene Hart tunnel
Groene Hart tunnel

Design-build of a rail tunnel (high-speed line linking Antwerp-Rotterdam-Amsterdam)

More info
Chongming Tunnel
Chongming Tunnel

Tunnel across the Yangtze Kiang Estuary

More info
Ferden Tunnel
Ferden Tunnel

Construction of the central section of the Lötschberg rail tunnel

More info