France, 2010 - 2011
General description
Construction of the pedestrian and cycle bridge alongside the Maréchal Leclerc masonry bridge in Olivet (45).
MAIN CHARACTERISTICS
- Construction of the footbridge from its foundations on the ground and in the Maréchal Leclerc bridge masonry and its access ramps
- Provision and installation of all its equipment
- Renovation of the Maréchal Leclerc masonry bridge superstructures: repairing surface and pavement upstream and downstream sides, replacing damaged parts on stone cornices and corbels, removal, renovation, re-installation of cast iron guard rails and repainting.