Salazie tunnel

Water supply tunnel between the east and west of La Réunion island

Underground Works

France, 1998 - 2014

General description

The work site is part of a larger project that involves using 30km of tunnels to transfer the water collected to the east, in the Salazie cirque, to the west coast to provide irrigation. This is the context in which our project is to build a tunnel 18 km long and 3.6 m in diameter. 

MAIN CHARACTERISTICS

Originally planned using a hard rock TBM (Tunnel Boring Machine), the 18 km of the Salazie tunnel were also partially excavated using explosives when hydro-geological conditions prevented using the tunnelling machine. This section was subsequently surfaced with an in situ concrete facing.

Consortium

Bouygues TP (mandataire) / DTP Terrassement / Razel / SPIE Batignolles

Project owner

Conseil Général de La Réunion

Key figures

18 km

of tunnels

3,6 m

in diameter

1 200 l/s

maximum output

Locations

Associated Projects

 HKW-DSD TUNNEL
HKW-DSD TUNNEL

Stormwater drainage tunnel

More info
Maurice Lemaire Tunnel
Maurice Lemaire Tunnel

Renovation of the existing structure and digging a safety tunnel

More info
ANDRA laboratory
ANDRA laboratory

Underground research laboratory

More info